Here are the first pictures of the construction in June for the Future Home Of Gateway Toyota! We are getting that much closer to our dream. Keep checking back with us
Step one: removing the topsoil.
Digging and grading.
Drilling holes for the pilings. There are 150 piling that are each 35 ft deep.
The foundation being put together.
The structural steel going up.
Check out the “We Are Moving” section of our blog for more updates.
Leave a Reply